Lightweight pumpset for filling and pressure testing of pipelines
Across the whole of Europe there are numerous pipelines projects being performed. In total, more than 3500 kilometres of pipeline (2200 miles) for the transport of gas, oil and/or water are being laid. | |||||||
Each set consists of two pumps mounted on a single skid. The first pump provides a duty point of 80 m3/h @ 15 bars of pressure and is used to fill the newly constructed pipeline with water. After the pipeline section is completely filled with water, the second pump is switched on to build the pressure inside the pipeline up to 250 bar. Any leaks in the pipeline section will become imminent, allowing them to be repaired before the trench is closed and the pipeline is buried. | |||||||
| | ||||||