This website uses cookies to enhance your experience.
A bone-dry construction site with BBA Pumps. We supply all the components needed for a professional wellpoint dewatering system. In fact, too many items to mention: vacuum filters up to 9 meters long, header pipes, settlement tanks, flow meters, connections, non-return valves and hoses.  

4 product(s) found
Sort by:
Jetting Tube 2" 5M 20M hose StorzNA81x65
Item No. 14600104
System : Wellpoint Systems
System : Wellpoint Systems
View product
Settlement tank 10-23
Max. flow : 180 m³/h
Max. flow : 180 m³/h
View product
    Loading
    Loading